Installation Master
Module 2
Pre-installation Checks

Pre-installation Checks
INSPECTING THE DOOR
At this crucial stage, it is vital that you carry out pre-installation checks prior to installing the door. What you don’t want, is to be halfway through an install and realise something isn’t correct, or that something is missing. Having your paperwork handy with your order confirmation present will make this possible. Checking dimensions, skin colour to frame colour, glass etc should become second nature to you.

About This Module
This module will tell you how to carry out essential pre-installation checks to ensure that the door you have ordered is correct, and there are no missing items or incorrect components.
0% COMPLETE
AS PER OUR 48 HOUR INSPECTION POLICY, WHAT SHOULD YOU HAVE ALREADY DONE?
Loaded the door onto your van
Carried out a thorough inspection of the door and reported any issues
Cleaned the door
WHATS THE FIRST THING YOU SHOULD CHECK THE DOOR AGAINST?
If the specification matches what you ordered, and the dimensions are correct
If the door goes with the colour of the brick
If the door matches the garage colour
WHAT SHOULD YOU ALLOW THE HOMEOWNER TO DO?
Check the door and make sure they are happy
Unwrap the door
Assist with the lifting
